Sampling of Past Projects
Per Owners’ request, Owner contact information is not widely published.
However, owner contact information can be obtained by contacting our Corporate Office at 530-378-6825.
| Project Title |
Owner |
Final Contract Amount | Period of Performance | Project Description |
| Manzanar Barracks Reconstruction |
National Park Service |
$876,348.00 |
March 2010 - July 2010 |
Design Build of historic barracks at Manzanar Historic Site. |
| Shasta Dam TCD Middle Gate Relief Panel Repair |
Bureau of Reclamation |
$783,617.00 |
December 2009 - July 2010 |
Surveyed middle gate relief panels, repairing and replacing those that were not up to standards. |
| Reconstruct Cook House at Scotty's Castle |
National Park Service |
$1,519,460.00 |
November 2009 - May 2010 |
Rehabilitation of fire damaged historic Cook House and construction of new Visitors Contact Station, offices and conference center. |
| Long Beach Paving |
US Army Corp of Engineers |
$1,464,004.00 |
November 2009 - March 2010 |
Remove and replace existing AC pavement with PC pavement around all facilities. Remove existing interior chain link fence and gate and replace with new chain link security fence and a 24ft rolling gate. Remove and replace existing wheel stops, stripe parking areas and provide signage. |
| Isabella Dam Site Maintenance and DSAP |
US Army Corp of Engineers |
$343,042.29 |
November 2009 - March 2010 |
Demolition of existing facilities and construction of a 3300SF pre-engineered metal building along with new utilities. Project included new service upgrade of existing office building. |
| Clear Creek Asbestos Decontamination Facility |
Bureau of Land Management |
$1,945,106.00 |
June 2009 - February 2010 |
Construction of an asbestos decontamination facility for BLM personnel. |
| Yosemite Integrated Utilities Phase 2 and 3A |
National Park Service |
$7,939,830.73 |
September 2008 - October 2009 |
Major construction activities while abiding by strict environmental controls, in close proximity to the public and coordinating with the park's concessionaires. |
| Bizz Johnson Trail Tunnel Repair Susanville, Lassen County, CA. |
Bureau of Land Management |
$413,017.00 |
May 2009 - August 2009 |
Portal concrete repair including contact grouting through tunnel ceiling, surface sealing of cracks, and epoxy injection of cracks. Timber tunnel repair, including cribbing, blocking, lagging, and reattachment of various timber support members. Rock scaling of all exposed rock surfaces within tunnel and concrete scaling of all loose concrete within tunnel portals. Regrading tunnel approaches and trail surfaces. |
| Tule Planting RD536 & RD2048 |
US Army Corp of Engineers |
$158,442.45 |
May 2009 - June 2009 |
|
| Levee Rehab RD551 & RD755 Sacramento County, CA. |
US Army Corp of Engineers |
$1,494,926.87 |
August 2008 - October 2008 |
Emergency levee repair contract for work along Sacramento River levee banks which included clearing and grubbing, extensive placement of Rip Rap and hydro-seeding. |
| Wave Attenuator Floats Lake Kaweah, Three Rivers, Tulare County, CA. |
US Army Corp of Engineers |
$115,022.00 |
February 2009 |
Construction and installation of wave reducing boom line in Lake Kaweah. |
| Consultant Service LAVO HQ Water |
National Park Service |
$6,955.00 |
June 2009 |
Provided consultancy services for preparation of final pre-bid solicitation package. |
| Whiskeytown Potable Water Tank Replacement Whiskeytown National Recreation Area, Trinity County, CA. |
National Park Service |
$481,793.00 |
January 2010 - May 2010 |
This project required the demolition of an existing steel water tank and replacement with a cast in place concrete foundation and a glass lined steel tank. Work included piping, pouring concrete footings, installation of tank and telemetry system, and disinfection and testing of the tank. |
| Reconstruct Furnace Creek Water System |
National Park Service |
$6,779,016.00 |
October 2007 - April 2009 |
Installation of over 15,000 feet of water mains; construction of a reverse osmosis filtration plant and structural concrete walls and slabs. The remote location of Death Valley National Park made logistics a key issue for this project. |
| Black Butte Paving & Erosion Control |
US Army Corp of Engineers |
$211,760.00 |
January 2008 - March 2009 |
|
| Dark Gulch |
Bureau of Reclamation |
$1,915,485.61 |
2008 - December 2008 |
|
| Pillar Point East Breakwater Half Moon Bay, San Mateo County, CA. |
US Army Corp of Engineers |
$846,580.00 |
July 2008 - December 2008 |
Repair of wave damaged breakwater in an area of extremely sensitive natural resources and high public visibility. Involved excavation and stockpiling of existing material, dewatering, placement of B1 underlayer material and A1 armor material and placement of stockpiled material to fill voids. |
| Moss Landing |
US Army Corp of Engineers |
$358,810.00 |
2008 - October 2008 |
|
| Willow Pole Planting |
US Army Corp of Engineers |
$133,330.00 |
October 2008 |
|
| Whiskeytown Structural Steel Treatment Plant Roofing |
National Park Service |
$213,040.00 |
January 2007 - May 2007 |
Structural steel framework and steel trusses for spanning WWTP tanks. |
| Cresent City Seismic Retrofit | National Park Service | $353,325.00 | October 2006 - February 2007 | Reconstruction of stairwells in 3 story Park Headquarters building. |